12/14/13 - Right Wing Sling

Right Wing Sling December 14, 2013 The right wing was done almost a week ago and I have done little on  the plane since then.  Mostly  because work  has really  been taxing at the end of the year and I need to take my remaining vacation or lose it by December 31st. I am off …

12/09/13 - Right Wing Finish

Dan Dec. 8, 2013    Last day for major work on right wing There were plenty of interruptions yesterday and today but the right wing is finally closed in and riveted with not much but a few small items to do before wing installation on the fuselage. Left To Do: Paint control rods Add nut …

12/06/13 - Right Wing Assembly Internal 1

Dan Dec. 6, 2013   –   Right wing internal checks before final rivet closure. So last night I expected tonight would be a lost night due to other commitments. As it turns out, everything opened up and my evening was open. Being below zero F there are few that want to go out so …