Skip to content
Sonex 1362
Sonex 1362

Sonex 1362

Building An Airplane From Plans

  • Empennage
    • Rudder
    • Vertical Stabilizer
    • Elevator
    • Horizontal Stabilizer
    • Tail Assembly
  • Wings
    • Ribs
    • Main Spar
    • Rear Spar
    • Wing Skins
    • Ailerons
    • Flaps
    • Left Wing Assembly
    • Right Wing Assembly
  • Fuselage
    • Aft Fuselage
      • Tail Cone Box
      • Turtle Deck
    • Forward Fuselage
      • Spar Tunnel
      • Seat
      • Flap Handle
    • Assembly
    • Landing Gear
    • Fuel Tank
    • Canopy
  • Controls
    • Dual Control Stick
    • Control Rods
    • Trim
  • Systems
    • Brakes
    • Fuel
    • Electrical
    • Lighting
  • Cockpit
    • Instrument Panel
    • Avionics
    • Upholstery
  • Engine
    • Selection
    • Installation
    • Alternator
    • Firewall
    • Cowling
    • Propeller
  • Information
    • Workshop
      • Tools
      • Powder Coating
    • F.A.Q.
      • What Is A Sonex
        • Dan’s Thoughts
        • Tim’s Thoughts
      • Who Are We
      • Where
      • Why
      • When
      • Plans or Kit
      • Taildragger or Tricycle
      • Priming Thoughts
      • Flush Rivets
    • Links
    • Status
Sonex 1362 > 2013 > November

Month: November 2013

Posted on November 12, 2013September 9, 2019

Control Rods Welding

We purchased the 4130 rods from Wicks Aircraft. Dan is good at Oxy-Acetylene welding. Here are some images of welding the ends of a couple control rods.

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org
Proudly powered by WordPress
Back